RFQ Goods/Services - Procurement of PTZ Camera Systems for Wildfire Monitoring Operations in Lebanon

UNOPS · Lebanon · Deadline: 23 Nov 2026

RFQ Goods/Services - Procurement of PTZ Camera Systems for Wildfire Monitoring Operations in Lebanon
UNOPS
RFQ Goods/Services - Procurement of PTZ Camera Systems for Wildfire Monitoring Operations in Lebanon
Request for quotation
Reference:
RFQ/2026/64607
Beneficiary countries or territories:
Lebanon
Registration level:
Basic
Published on:
08-Oct-2026
Deadline on:
16-Nov-2026 09:00 (GMT 0.00)
Description
Tender description: Procurement of PTZ Camera Systems for Wildfire Monitoring Operations in Lebanon
-----
IMPORTANT NOTE: Interested vendors
must respond to this tender using the UNOPS eSourcing system
, via the UNGM portal. In order to access the full UNOPS tender details, request clarifications on the tender, and submit a vendor response to a tender using the system, vendors need to be registered as a UNOPS vendor at the UNGM portal and be logged into UNGM. For guidance on how to register on UNGM and submit responses to UNOPS tenders in the UNOPS eSourcing system,
please refer to the user guide and other resources available at:
https://esourcing.unops.org/#/Help/Guides
Interested in improving your knowledge of what UNOPS procures, how we procure and how to become a vendor to supply to our organization? Learn more about our free online course on “Doing business with UNOPS”
here
Documents
Contacts
Sustainability
Links
UNSPSC codes
Revisions
RFQ - Contract Forms.docx
RFQ_Section_I_InstructionstoBidders (4).pdf
RFQ_Section_III_ReturnableBiddingForms_Wildfire PTZ Cameras_June2026 REV 1.docx
RFQ_Section_II_ScheduleofRequirements_Wildfire PTZ Cameras REV 1.docx
UNOPS Minimum Health and Safety Requirements for Contractors .pdf
No files selected
This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido publicada usando el sistema eSourcing de UNOPS. Vendor Guide / Guide pour Fournisseurs / Guíra para Proveedores: https://esourcing.unops.org/#/Help/Guides
First name:
N/A
Surname:
N/A
This procurement opportunity integrates considerations for at least one sustainability indicator. However, it does not meet the requirements to be considered sustainable.
Gender issues
Social
The tender contains sustainability considerations addressing gender equality and women's empowerment.
Examples:
Gender mainstreaming, targeted employment of women, promotion of women-owned businesses.
Link
Description
https://esourcing.unops.org/#/Help/Guides
UNOPS eSourcing – Vendor guide and other system resources / Guide pour fournisseurs et autres ressources sur le système / Guía para proveedores y otros recursos sobre el sistema
No revisions have been made.
New clarification added: Questions:Camera Monitoring: Will the cameras be monitored centrally by the (MOE) or separately by each municipality? Will monitoring take place from a single location or multiple locations?Control Room: Is a centralized control room required to monitor all cameras, or will monitoring be managed separately by each municipality?Recording and Storage: Is centralized video recording required at the MOE level, or should recordings be stored locally within each municipality?Cloud-Based Solution: Would it be acceptable to propose a cloud-based solution in which cameras record footage both locally on SD cards and in the cloud? This would allow an access to the cloud platform from anywhere for live monitoring, video playback, and analytics.UNOPS answers - in same sequential order:The cameras will be monitored by the respective Unions of Municipalities and/or Municipalities from three separate control rooms.Monitoring will be managed independently by each Municipality and/or Union of Municipalities from three separate control rooms.As specified in requirement 2.11 in Section II: Schedule of Requirements, each camera must have sufficient storage capacity to retain up to 24 hours of footage per day for a period of 30 days. No centralized recording required at the MoE level. The cameras will be monitored by the respective Unions of Municipalities and/or Municipalities from three separate control rooms.If the proposed cloud-based solution is compatible with the requirements specified below, then it would be acceptable: As specified in requirement 2.11 in Section II: Schedule of Requirements, the Bidder has to Provide a complete recording and storage solution supporting live monitoring, recording, playback, search, and export of recorded footage, with a retention period of 30 days. Only fully remote storage solutions shall be used, such as SD/microSD card storage or equivalent integrated storage solutions. No cable connections or conventional DVR systems shall be used. Each camera must have sufficient storage capacity to retain up to 24 hours of footage per day for a period of 30 days.
Edited on:
30-Oct-2026 12:27
Edited by:
[email protected]
New clarification added: Questions:Installation Locations & Civil Works: As exact locations are unavailable, kindly clarify whether mounting poles must be supplied or existing structures utilized, including the required mounting types (poles, walls, rooftops), heights, brackets, foundations, and associated civil works. Site coordinates or indicative locations are essential to assess accessibility, transportation, manpower, accommodation, and installation costs.Control Rooms & Servers: How many control rooms are required? Please clarify whether servers, workstations, monitors and associated infrastructure are included in the scope or provided by the beneficiary.PTZ Joysticks: Are dedicated PTZ joysticks/keyboards required? If so, kindly specify the quantities.Connectivity & Storage: Please confirm the intended communication method, responsibility for SIM cards/data subscriptions, and whether the required 30-day recording must be stored entirely within each camera or whether additional local storage equipment is acceptable.Shipping & Delivery: The specified six-week delivery period may be achievable through airfreight, subject to equipment availability, but significantly increases costs. Sea freight, including procurement and import arrangements, may require approximately 3–4 months, particularly as these specialized items are not readily available locally. Considering the additional installation and commissioning requirements, kindly clarify whether the six-week deadline applies to delivery only or full operational handover.To ensure equal competition, we respectfully suggest establishing a common shipping basis for all bidders, with airfreight and sea freight costs identified separately, and considering an extended delivery period for the more economical sea-freight option.Pricing & Site Variations: Given that final installation locations will only be confirmed after award, kindly clarify how unforeseen civil works, difficult site access, or additional infrastructure requirements will be addressed, particularly considering the fixed unit pricing and permitted ±30% quantity variation.UNOPS Answers - in same sequential order:As specified in Section II: Schedule of Requirements, Item # 2 – Mounting Structure / Camera Pole (OPTIONAL), the pricing for this item is mandaotry, however the award is subject to fund availability. For the complete technical specifications and requirements applicable to the mounting poles, please refer to Item # 2 of Section II: Schedule of Requirements. The construction of pole foundations and any other civil works are not included in the scope of this tender. Site coordinates or indicative locations are not available at this stage. The PTZ cameras will be installed in different forests across Lebanon for wildfire monitoring purposes.The PTZ cameras will be managed and monitored from three control rooms. The equipment required for this scope of work is limited to the items listed in Section II: Schedule of Requirements. Associated equipment and infrastructure are provided by the beneficiaryThe equipment required for this scope of work is limited to the items listed in Section II: Schedule of Requirements.As specified in requirement 2.11 in Section II: Schedule of Requirements, the Bidder has to Provide a complete recording and storage solution supporting live monitoring, recording, playback, search, and export of recorded footage, with a retention period of 30 days. Only fully remote storage solutions shall be used, such as SD/microSD card storage or equivalent integrated storage solutions. No cable connections or conventional DVR systems shall be used. Each camera must have sufficient storage capacity to retain up to 24 hours of footage per day for a period of 30 days. An internet connection shall be provided by the Bidder for testing and commissioning purposes. However the internet data plan required for the subsequent operation of the cameras are excluded from the project scope.Bidders must comply with the Delivery and installation time specified in Scheduled of Requirements REV 1 for completing the deliverable and installation of goods, regardless of the mode of shipping used (e.g., airfreight or sea freight). Installation should commence as soon as the equipment is delivered, even if delivery occurs prior to the end of the 12-weeks period.The PTZ cameras will be installed at various forest locations across Lebanon for wildfire monitoring purposes. No civil works are included in the scope of this tender. The scope is limited to the supply and installation of the equipment, listed in Section II: Schedule of Requirements. Delivery terms are included in the Section II: Schedule of Requirements.
Edited on:
30-Oct-2026 12:24
Edited by:
[email protected]
New clarification added: Question 1:Who provides and pays for the SIM data plans, and for how long after handover?Answer 1:As specified in the project scope Section II: Schedule of Requirements the Bidder shall supply, deliver, install, configure, test, commission, and hand over outdoor IP PTZ cameras intended for monitoring purposes. The SD/microSD card storage or equivalent integrated storage solutions shall be provided by the Bidder as specified in Section II: Schedule of Requirements, Recording & Storage - requirement no. 2.11. An internet connection shall be provided by the Bidder for testing and commissioning purposes. However the internet data plan required for the subsequent operation of the cameras are excluded from the project scope.Question 2:Are poles or masts and their foundations in scope? If yes, what height?Answer 2:Please refer to the revised Section II: Schedule of Requirements: Item # 2 – Mounting Structure / Camera Pole (OPTIONAL): the pricing for this item is mandaotry, however the award is subject to fund availability. The poles shall have a minimum height of 10 meters and be made of galvanized steel or other materials offering equivalent corrosion protection. Please note that the construction of foundations is excluded from the scope of this tender. For the complete technical specifications and requirements applicable to the mounting poles, please refer to Item # 2 of Section II: Schedule of Requirements - REV 1Question 3:Where should the monitoring client or workstation be installed: MoE, Civil Defense or the municipalities?Answer 3:The PTZ cameras will be installed in different forests across Lebanon for wildfire monitoring purposes. As specifiedin Section II: Schedule of Requirements, Section C - Delivery place and Incoterms rules, Delivery shall be carried out in accordance with the instructions issued by the Ministry of Environment (MoE) to the municipalities within Akkar, Dennieh, and Chouf areas. The exact delivery locations shall be confirmed by the MoE at the time of delivery.Question 4:Can you confirm that edge recording on SD with remote playback over 4G meets "fully remote storage solutions"?Answer 4:The objective is to ensure that footage is stored either exclusively on the camera’s local SD card or also transmitted to a remote server or cloud platform. No wired connections should be used; all data storage and transmission must be wireless.Question 5:Does the 6-week deadline cover delivery only, or installation too?Answer 5:Please refer to Section II: Schedule of Requirements - REV 1: Delivery and installation time: Bidder shall deliver (and install) the goods as follows:Item 1 only: within six (6) weeks from Contract signature date.Item 1 and 2 combined: within twelve (12) weeks from Contract signature date.
Edited on:
30-Oct-2026 12:18
Edited by:
[email protected]
New amendment added #2: Amendment No. 2 is issued to:Amend the requirements. Please refer to the Documents tab on eSourcing. Changes made to the "RFQ_Section_II_ScheduleofRequirements_REV 1" and to the "RFQ_Section_III_ReturnableBiddingForms_REV 1" are made in blue color.Upload UNOPS Minimum Health and Safety Requirements for Contractors. Please refer to the Documents tab on eSourcing.Extend the deadlines for clarification and submission. Please refer to the particulars tab on eSourcing.All other terms and conditions remain the same
Edited on:
30-Oct-2026 10:46
Edited by:
[email protected]
New amendment added #1: Amendment No. 1 is issued to extend the submission deadline to November 2, 2026, and the clarification deadline to October 26, 2026.
Edited on:
19-Oct-2026 12:55
Edited by:
[email protected]

Apply on the UNOPS website

New UN jobs every morning on Telegram: @unjobshub

All open positions at UNOPS