Construction of Mandalgobi-Arvaikheer 220kV Double-Circuit Transmission Line (287 km) - (Three lots)

World Bank · Mongolia · Deadline: 11 Dec 2026

Specific Procurement Notice – Initial Selection Document (ISD)

Invitation for Initial Selection

Plant

(Design, Supply, and Installation)

Procurement of:

Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV (287 km) Double-Circuit Transmission Line, in Three Lots

Employer: Ministry of Energy of Mongolia (MOE)

Project: Fourth Energy Sector Project (ESP4)

Contract title: Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV (287 km) Double-Circuit Transmission Line, in Three Lots

Country: Mongolia

Loan No.: IBRD Loan No. 9873-MN

RFB No: MN-MOE-ESP4-1-CW-RFP

Issued on: 29 October 2026

  1. The Government of Mongolia has applied for financing from the World Bank toward the cost of the Fourth Energy Sector Project (P509161) and intends to apply part of the proceeds toward payments under the contracts for “Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV Double-Circuit Transmission Line (287 km), in Three Lots”.
  2. The Ministry of Energy intends to initially select Applicants for Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220kV Double-Circuit Transmission Line (287 km), in Three Lots.

CONTRACT DESCRIPTION

CONTRACT PERIOD

Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220kV Double-Circuit Transmission Line (287 km), in Three Lots

Lot 1: Tower No.1 to Tower No. 288

Lot 2: Tower No.289 to Tower No. 580

Lot 3: Tower No.581 to Tower No. 868

Time for Completion:

24 months

(Design Verification, Update and Construction) for each lot (Lot 1, Lot 2 and Lot 3)

Defect notification period:

36 months

Applicants are expected to have the following minimum requirements:

A. For International Applicants

Item

Qualification Criteria

(US$ million)

Lot 1

Lot 2

Lot 3

For Multiple Lots

Minimum average annual turnover in Plant Design, and/or Supply and/or Installation within the last 3 years (2023, 2024 and 2025)

11.00

11.00

11.00

  • Two lots: US$ 22.0 million;
  • Three lots: US$ 33.0

Minimum financial capabilities (cash flow requirement)

3.70

3.70

3.70

  • Two Lots: US$ 7.40 million;
  • Three Lots: US$ 11.10 million

Minimum Value of one (1) contract of specific / similar size and nature (at least 60 km length, with avoltage level of 220 kV or above)

9.30

9.30

9.30

  • Two Lots: ≤ Two (2) similar contracts, each with a minimum value of US$9.3 million equivalent, but with the total value of the contract(s) equal to or greater than US$18.6 million equivalent.
  • Three (3) Lots: ≤ Three (3) similar contracts, each with a minimum value of US$9.3 million equivalent, but with the total value of the contract(s) equal to or greater than US$27.9 million equivalent.

B. For Local Applicants (due to a short construction season)

Item

Qualification Criteria

(US$ million)

Lot 1

Lot 2

Lot 3

For Multiple Lots

Minimum average annual turnover in Plant Design, and/or Supply and/or Installation within the last 3 years (2023, 2024 and 2025)

11.00

11.00

11.00

  • Two lots: US$ 22.0 million;
  • Three lots: US$ 33.0

Minimum financial capabilities (cash flow requirement)

3.70

3.70

3.70

  • Two Lots: US$ 7.40 million;
  • Three Lots: US$ 11.10 million

Minimum Value of one (1) contract of specific / similar size and nature (at least 30 km length, with avoltage level of 220 kV or above)

6.00

6.00

6.00

  • Two Lots: ≤ Two (2) similar contracts, each with a minimum value of US$6.0 million equivalent, but with the total value of the contract(s) equal to or greater than US$12.0 million equivalent.
  • Three (3) Lots: ≤ Three (3) similar contracts, each with a minimum value of US$6.0 million equivalent, but with the total value of the contract(s) equal to or greater than US$18.0 million equivalent.

It is expected that the Request for Proposals will be issued in January 2027.

  1. Initial Selection will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers, February 2025 (“Procurement Regulations”), and is open to all eligible Applicants as defined in the Procurement Regulations.
  2. Interested eligible Applicants may obtain further information from the Ministry of Energy at the address below during office hours 09:00 to 17:00 hours.

Attention: Mr. Munkhbadral.P, Specialist of Policy and Planning Department

Address: Room No. 213, Ministry of Energy, Government Building 14, Chinggis Avenue, Khan-Uul District, Ulaanbaatar 17060, Mongolia

Phone: +976 51263094,

Email address: [email protected]

  1. A complete set of Initial Selection documents in English may be obtained free of charge by interested Applicants on the submission of a written application to the address below. The Initial Selection Document will be provided electronically by email.
  1. A pre-application meeting will be held virtually on 20 November 2026 at 15:00 Hours (Local time). The meeting link will be provided to all registered Applicants via their official email addresses.
  2. Applications for Initial Selection should be submitted in clearly marked envelopes and delivered to the address below by 14:00 Hours (Local time) on 11 December 2026. Late Applications will be returned unopened.

Attention: Mr. Munkhbadral.P, Specialist of Policy and Planning Department

Address: Ministry of Energy, Government Building 14, Chinggis Avenue,

Khan-Uul District, Ulaanbaatar, Mongolia

Floor/ Room number: Third Floor, Meeting Room No.314

City: Ulaanbaatar

ZIP Code: 17060, Country: Mongolia

Apply on the World Bank website

New UN jobs every morning on Telegram: @unjobshub

All open positions at World Bank