Consulting Services for the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova

World Bank · Moldova · Deadline: 02 Dec 2026

REQUEST FOR EXPRESSIONS OF INTEREST

(CONSULTING SERVICES – FIRMS SELECTION)

Republic of Moldova

Strengthening Moldova’s Disaster Risk Management and Resilience Project

Loan No.: 9720-MD

Assignment Title: Consulting Services for the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova

Reference No. (as per Procurement Plan): MD-OEAPM-578962-CS-QCBS

The Government of the Republic of Moldova has received financing from the World Bank toward the cost of the Strengthening Moldova’s Disaster Risk Management and Resilience Project, and intends to apply part of the proceeds for consulting services.

The consulting services (“the Services”) include the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova.

The Terms of Reference (TOR) for the primary procurement stage for the assignment are attached to this request for expressions of interest.

The Ministry of Infrastructure and Regional Development (MIRD) and the P.I. “Office for External Assistance Programs Management” (OEAPM) Project Implementation Unit (PIU) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are:

  • At least 5 years of experience in developing a technically sound seismic risk methodology, data architecture, indicators, GIS-ready outputs and functional specification for the interactive map.

Only the firm’s relevant experience and qualifications will be assessed at the shortlisting stage. Key Experts are not required to be proposed and will not be evaluated at this stage.

The shortlist will contain five (5) to eight (8) firms.

The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.

Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.

A Consultant will be selected in accordance with the Quality and Cost-based Selection method described in the Procurement Regulations and to be specifically set out in the Request for Proposals.

Further information can be obtained at the address below during office hours 08:30 to 17:30 hours.

Expressions of interest must be delivered in a written form to the address below (by e-mail) by 17:30 local time, December 2, 2026.

Attn: Ms. Raia CANTEMIR

Director, Office for External Assistance Programs Management / PIU

57/1 Mitropolitul Banulescu Bodoni str., office 306, MD-2005, Chisinau, Republic of Moldova

Tel: 373 22 23 29 63, 373 23 82 48

E-mail: [email protected]

www.ogpae.gov.md

TERMS OF REFERENCE

for Consulting Services for the Development of the Methodology for the Elaboration of the Interactive Map on Seismic Risk in the Republic of Moldova

Contents

1. Background and Rationale. 4

1.1. Conceptual scope of the interactive seismic risk map. 4

1.2. Boundaries of this assignment 5

1.3. Justification and need. 6

1.4. Legal and regulatory framework. 6

2. Objective of the Assignment 7

2.1. Intended use of outputs and end users. 8

3. Scope of Services. 9

3.1. Review of the existing legal, policy, normative and technical framework. 9

3.2. Review of seismic risk methodology, models and relevant international practice. 10

3.3. Data inventory and data architecture for hazard, exposure, vulnerability and ancillary data. 11

3.4. Development of seismic risk calculation model and scenarios. 12

3.5. Exposure and vulnerability modelling rules. 13

3.6. Definition of risk indicators, derived indicators and threshold intervals. 14

3.7. Functional specification for the Interactive Seismic Risk Map 15

3.8. Methodology piloting, validation and use-case testing. 16

3.9. Technical workshops, consultations and revision based on comments. 17

3.10. Final methodology, interactive map package and handover documentation. 18

3.11. Implementation roadmap, data management and sustainability. 18

3.12. Cross-ToR coordination, Common Data Standard and procurement packaging. 19

3.13. Buildings-focused seismic resilience strategic framework. 20

4. Quality Assurance and Technical Requirements. 21

4.1. Methodological consistency, scientific traceability and reproducibility. 21

4.2. Compatibility with the hazard methodology, RVS, NCM framework and QAP. 22

4.3. Data, GIS, metadata and digital package requirements. 22

4.4. Risk model verification, uncertainty treatment and sensitivity checks. 23

4.5. Functional specification quality requirements and UAT readiness. 23

4.6. Internal QA/QC, peer-review, registers and controlled revisions. 23

4.7. Acceptance of deliverables by the Beneficiary. 24

5. Deliverables and Timeline. 25

6. Reporting and Format of Deliverables. 26

6.1. Language of deliverables, reporting process and final submission package. 26

6.2. Required formats: DOCX, PDF, XLSX/CSV, GIS files, maps, metadata, calculation annexes and editable files. 27

7. Key Qualification Requirements. 27

7.1. Key Expert 1 - Team Leader / Senior Seismic Risk Methodology Specialist 28

7.2. Key Expert 2 - Exposure, Vulnerability and Seismic Risk Modelling Specialist 28

7.3. Key Expert 3 - GIS, Spatial Data and Data Architecture Specialist 29

7.4. Mandatory non-key expert — IT / Web-GIS Functional Specification and Demonstrator Specialist 30

7.5. Non-Key Experts / Support Experts. 30

8. Client's Inputs and Institutional Coordination. 31

8.1. Available documents. 31

8.2. Coordination with MIRD and OEAPM/PIU.. 31

8.3. Access to available data. 31

8.4. Comments on deliverables. 32

8.5. Technical meetings and consultations. 32

9. Evaluation of Technical and Financial Proposals. 32

9.1. Technical Evaluation Criteria. 33

9.2. Financial Evaluation. 36

9.3. Combined Evaluation. 37

9.4. Award Criterion. 37

  1. Background and Rationale

The Government of the Republic of Moldova is implementing the Strengthening Moldova's Disaster Risk Management and Resilience Project (SMORE), financed by the World Bank. The Project aims to strengthen national preparedness and resilience to natural hazards and climate-related shocks, including through improved policy, regulatory and technical instruments for disaster risk reduction.

This assignment is part of Subcomponent 3.1 - which includes technical assistance for the development of methodologies, regulatory documents, data systems and supporting tools aimed at reducing seismic risk in the Republic of Moldova. Within this framework, the methodology for the elaboration of the Interactive Map on Seismic Risk is required as a core technical product linking seismic hazard, exposure and vulnerability information into a coherent and usable risk assessment framework.

The Republic of Moldova is exposed to significant seismic hazard, primarily generated by the Vrancea intermediate-depth seismic source (Romania), which has historically affected the entire territory of the country. The 1940 (M 7.4) and 1977 (M 7.2) earthquakes underlined the vulnerability of the existing building stock and the importance of integrated risk assessment for prioritization of public investment, retrofit planning and emergency preparedness. In this context, an interactive seismic risk map — built on an explicit and reproducible methodology — is a foundational instrument for evidence-based seismic risk management.

    1. Conceptual scope of the interactive seismic risk map

Object of the risk assessment. This Terms of Reference addresses the seismic risk of buildings. The primary risk objects of the methodology and of the interactive map are buildings — residential, public and other categories agreed with the Client — consistent with the PAD, with the RVS methodology under GD 334/2025 (Activity 1b) and with the retrofit feasibility studies under Activity 1d. Critical facilities and infrastructure may be represented as contextual/ancillary layers for interpretation and prioritization (e.g. location of hospitals, schools, emergency services), but the full seismic risk modelling of infrastructure networks (utilities, transport, lifelines) is outside the scope of this assignment, because it requires component-specific fragility models and network data that are not available in the Republic of Moldova and are not covered by the Subcomponent 3.1 data chain

The interactive seismic risk map is not, by design, a mere visualization product. It is the visible output of a structured technical process that must define: the data architecture, the calculation logic, the risk indicators and their thresholds, the treatment of uncertainties, the scenarios to be assessed, and the rules for presenting results in a transparent, auditable and reproducible manner. The map shall enable public authorities, technical experts and decision makers to identify where seismic risk is concentrated, which factors drive that risk, and how alternative assumptions or scenarios affect the outcome.

The assignment is closely coupled with the other outputs of Subcomponent 3.1, in particular: (i) the methodology for seismic hazard zoning developed under Activity 1a, which provides the hazard input layer; (ii) the Rapid Visual Screening (RVS) methodology operationalized through Activity 1b, which provides the building-level exposure and vulnerability data; (iii) the future regulatory NCM package harmonized with Eurocode 8; and (iv) the seismic risk reduction recommendations to be developed under subsequent project activities. The methodology for the interactive risk map shall therefore be designed to be coherent with hazard, exposure and fragility/vulnerability datasets, compatible with GIS-based workflows, and suitable for integration into institutional planning and regulatory-support activities, applying the Common Data Standard and the coordination mechanism defined in Section 3.12.

    1. Boundaries of this assignment

Methodology — not software development. This assignment is preparatory and methodological in nature. It explicitly covers the development of the seismic risk methodology for buildings, the data architecture, the calculation model, indicators and thresholds, the functional specification for the interactive map, and (where feasible within available data) a methodological pilot or demonstrator. It does not include full-scale software/web-GIS development, deployment of a production IT platform, code production, hosting infrastructure, large-scale data acquisition, or final population of the interactive map with the complete national dataset, all of which are foreseen as subsequent activities to be procured under separate contracts.

Accordingly, the critical quality risk under this assignment is not the coding of an interactive web-GIS application, but the correct translation of seismic risk principles, hazard-exposure-fragility/vulnerability integration logic, indicator structure, threshold classification and GIS data architecture into a complete, internally coherent and procurement-ready specification. Where a pilot or demonstrator is included, it shall serve only to test and validate the methodology — not to substitute the future production interactive map system.

In line with the principle of fit-for-purpose expertise, the Key Experts required under this Terms of Reference shall be focused on seismic risk methodology, exposure and fragility/vulnerability modelling, structural and earthquake engineering, and GIS / spatial-data architecture. Given the role of the pilot/demonstrator and of the functional specification, an IT / Web-GIS specialist shall additionally be included in the team as a mandatory non-key expert (Section 7.4), assessed on a responsive basis;IT or web-GIS development input may be mobilized as non-key or short-term support, including through subcontracting or through qualified members of the Consultant's technical team with proven experience in interactive mapping or web-GIS configuration.

This Terms of Reference also includes, as a secondary and framework-level output built on the seismic risk map results, a buildings-focused seismic resilience strategic framework (Section 3.13). This framework is deliberately limited to the building sector and to the strategic (policy and prioritization) level; it is not a full standalone National Seismic Risk Reduction Strategy. The broader themes of institutional arrangements, emergency response, reconstruction planning, financing mechanisms and public communication are identified as follow-on activities rather than developed under this assignment.

    1. Justification and need

The Republic of Moldova currently lacks an integrated, methodologically harmonized and publicly accessible seismic risk mapping framework. Existing seismic hazard maps, building data and disaster risk information are fragmented across institutional sources, are not structured around a common data architecture, and are not yet integrated into a transparent risk-calculation framework usable for policy, investment and emergency preparedness decisions. A robust, traceable and reproducible methodology for the elaboration of an Interactive Seismic Risk Map is therefore a precondition for:

  • the integration of the seismic hazard zoning developed under Activity 1a with the exposure and vulnerability data collected through the RVS process under Activity 1b;
  • the prioritization of public buildings and critical infrastructure for detailed seismic assessment, retrofit feasibility studies and public-investment decisions;
  • the alignment of national practice with recognized international risk-mapping frameworks (GEM, UNDRR, JRC, INFORM Risk, Risk Data Library and equivalent);
  • evidence-based decision making for seismic risk reduction at central, regional and local government levels;
  • transparent, auditable communication of risk to non-specialist audiences while preserving scientific rigour;
  • the preparation of a defensible, technology-neutral procurement of any future interactive map development service, in line with World Bank Procurement Regulations.
    1. Legal and regulatory framework

The services to be carried out under this Terms of Reference shall comply with, but not be limited to, the following legal and regulatory references:

  • Code of Urbanism and Construction No. 434/2023 (Codul Urbanismului i Construciilor) and subsequent implementing acts;
  • Government Decision No. 334 of 05.06.2025 on the Regulation for Rapid Visual Screening (RVS) of existing buildings;
  • NCM A.07.02 — Quality assurance in design and execution of constructions;
  • EN 1998-1:2004 + A1:2013 — Eurocode 8: Design of structures for earthquake resistance — Part 1: General rules, seismic actions and rules for buildings;
  • EN 1998-3:2005 — Eurocode 8 — Part 3: Assessment and retrofitting of buildings;
  • ISO 19115 — Geographic information — Metadata; INSPIRE Directive principles for spatial-data interoperability;
  • OGC standards for web-GIS services (WMS, WFS, WMTS) — to be referenced where relevant for the functional specification;
  • Law No. 133/2011 on the protection of personal data, with subsequent amendments;
  • Law No. 271/1994 on civil protection, and the institutional framework for emergency management in the Republic of Moldova;
  • Reference international frameworks: GEM (Global Earthquake Model) risk methodology, UNDRR/UNISDR risk terminology, JRC INFORM Risk Index, Sendai Framework for Disaster Risk Reduction 2015–2030;
  • Recent Romanian national methodology for the development of seismic risk maps and related Ro-Risk outputs (reference regional practice for Vrancea-type intermediate-depth seismicity);
  • World Bank Procurement Regulations for IPF Borrowers (current edition);
  • World Bank Environmental and Social Framework (ESF) — relevant Environmental and Social Standards;
  • Quality Assurance Plan (QAP) of Subcomponent 3.1 — current approved version.
  1. Objective of the Assignment

The general objective of the assignment is to develop a complete and technically justified methodology for the elaboration of the Interactive Map on Seismic Risk of buildings for the Republic of Moldova, including the conceptual model, data architecture, calculation approach, indicators, threshold intervals, GIS/data requirements and functional specification necessary for practical implementation.

The assignment shall establish how seismic risk is calculated, documented and communicated by combining the three fundamental components of seismic risk: hazard, exposure and fragility/vulnerability. The Consultant shall define the required input data, minimum attributes, spatial units, assumptions, formulas, risk scenarios, uncertainty treatment, classification logic and outputs to be used for the interactive map.

The specific objective is to produce a methodology that can be used by MIRD, OEAPM/PIU, technical reviewers, consultants, public authorities and other designated users as a reliable reference for seismic risk mapping, prioritization and decision support. The methodology shall not be limited to a narrative description; it shall provide practical rules, tables, matrices, data templates and calculation logic that allow the results to be verified and reproduced.

The assignment shall also produce the functional specification for the Interactive Seismic Risk Map. This specification shall describe required layers, filters, tools, comparison of results and scenarios, import/export functions, reporting functions, access modes, performance expectations, scalability, security, auditability and update mechanisms. This shall be prepared as a technical bridge between the seismic risk methodology and any future or parallel IT/web-GIS implementation.

In addition, and building on the outputs above, the assignment shall produce a concise, buildings-focused seismic resilience strategic framework (Section 3.13). Drawing on the seismic risk map methodology and its results, this framework shall set out protection objectives and target safety/performance levels for the retrofitting of existing buildings and for the design of new construction, the use of risk information for building-code (NCM/EC8) implementation, retrofit prioritization for public and critical-use buildings, broader building-stock risk-reduction goals, and a strategic (portfolio-level) cost-benefit perspective to support investment prioritization. Consistent with the PAD (recommendations for integrated interventions), this remains a framework-level output and does not constitute a full standalone national strategy.

The assignment is primarily a seismic risk methodology, data architecture and GIS specification assignment. It is not intended to be a complex software development contract. Any IT/web-GIS support required for functional specification, configuration of a simple demonstrator, or preparation of handover materials shall be provided through the mandatory non-key IT/Web-GIS expert (Section 7.4) and, if needed, additional non-key support, while the core responsibility remains with seismic risk, exposure/vulnerability and GIS/data experts.

The final product shall include the written methodology, calculation model description, data architecture, risk indicators and thresholds, technical workshop records, functional map specification, GIS-ready data structures, metadata templates, QA/QC registers and, where feasible within available data, a pilot or demonstrator map package in study areas decided by the Client (pilot area: municipality of Chisinau). All deliverables shall be traceable, internally consistent and coherent with the Quality Assurance Plan (QAP) applicable to Subcomponent 3.1.

    1. Intended use of outputs and end users

The methodology and the interactive map specification shall be designed for the following minimum categories of end users and decision use cases, which shall be explicitly addressed in the indicator framework (Section 3.6), the functional specification (Section 3.7) and the pilot use cases (Section 3.8):

  • MIRD and central public authorities — prioritization of public buildings for detailed seismic assessment and retrofit investment (link to Activity 1d), regulatory support and national reporting;
  • municipalities and local public authorities — identification of high-risk building concentrations, local prioritization and planning;
  • emergency management institutions (IGSU and the civil-protection framework under Law 271/1994) — scenario-based preparedness and response planning inputs;
  • public-investment planning entities and development partners — evidence base for programming and financing of risk-reduction interventions;
  • technical community and public — transparent, appropriately aggregated risk communication.

To support prioritization of public assets, the indicator framework shall include a criticality-adjusted risk perspective (weighting or flagging of public and critical-use buildings such as schools, hospitals, emergency facilities) and a social-vulnerability perspective as defined in Sections 3.5 and 3.6

  1. Scope of Services

The Consultant shall provide all services necessary for the preparation of the Methodology for the elaboration of the Interactive Map on Seismic Risk and the associated technical specifications. The services shall cover review of the relevant framework, identification and structuring of data, formalization of seismic risk calculation models, definition of indicators and threshold intervals, preparation of functional requirements for the interactive map, consultations with stakeholders, piloting/validation of the methodology and preparation of the final handover package, including the implementation roadmap and cross-ToR coordination defined in Sections 3.11 and 3.12.

The Consultant shall ensure that all activities are carried out in a transparent, traceable and verifiable manner. Data sources, limitations, assumptions, formulas, processing steps, scenarios, model choices and map outputs shall be documented with sufficient clarity to allow technical review and future updating. The Consultant shall avoid treating data or calculations as a black box; each stage from data source to risk output shall be explainable.

The following subsections describe the minimum required scope. The Consultant may propose additional tasks or refinements if they strengthen the quality, usability and sustainability of the methodology, provided that they remain consistent with the objective, budget and project calendar.

    1. Review of the existing legal, policy, normative and technical framework

The Consultant shall review the legal, policy, technical and institutional framework relevant to seismic risk assessment, risk mapping, disaster risk reduction, construction regulation, public infrastructure planning, GIS/data governance and public access to risk information in the Republic of Moldova.

The Consultant shall review and comply with the applicable requirements of the Project's Environmental and Social Commitment Plan (ESCP), Environmental and Social Management Framework (ESMF), Labor Management Procedures (LMP), Stakeholder Engagement Plan (SEP), and Grievance Redress Mechanism (GRM), as relevant to the scope of the assignment. All personnel engaged under the assignment shall comply with the Project Code of Conduct, including provisions on the prevention of Sexual Exploitation and Abuse and Sexual Harassment (SEA/SH).The review shall cover, as applicable, national legislation and strategies related to disaster risk management and construction, Moldovan Construction Norms (NCM), relevant Eurocode 8 principles, documents developed under Subcomponent 3.1, available procedures for technical regulation and approval, and institutional responsibilities related to data ownership, update, publication and use.

The Consultant shall prepare a Legal, Policy and Technical Framework Review Table with at least the following columns: document/code, title, year/version, issuing authority, relevance for seismic risk mapping, provisions to be considered, gaps/limitations and implication for the methodology. The review shall identify requirements and constraints that may influence the risk model, data architecture, map publication, access rights, update process and institutional use.

The Consultant shall provide a short gap analysis explaining what is missing or insufficiently defined in the current framework regarding seismic risk mapping, exposure/vulnerability data, risk indicators, thresholds, use of GIS data and interactive communication of results. The analysis shall explain how the methodology will support evidence-based decision making while remaining compatible with the national construction and disaster risk management framework.

    1. Review of seismic risk methodology, models and relevant international practice

The Consultant shall review recognized international and regional methodologies for seismic risk assessment and seismic risk mapping. The review shall include, as relevant, approaches used by GEM, UNDRR, JRC, European and regional initiatives, the recent Romanian national methodology for the development of seismic risk maps (including the Ro-Risk experience for Vrancea intermediate-depth seismicity), and other scientifically recognized models or guidance documents relevant to the Republic of Moldova.

The review shall focus on the conceptual and mathematical structure of seismic risk assessment, including the relationship between hazard, exposure and vulnerability, the use of scenario-based and probabilistic approaches, loss/damage indicators, uncertainty treatment, aggregation levels, classification of risk levels and communication of risk results through maps and dashboards.

The Consultant shall prepare a Methodology and Good Practice Inventory indicating at least: source/model, author/institution, year/version, risk components covered, calculation concept, required data, outputs/indicators, applicability for Moldova, limitations and proposed use in the methodology. The Consultant shall not automatically adopt an external model; the selected approach shall be adapted and justified for the Moldovan context. For clarity, this Inventory is a supporting analysis within this assignment: it shall be prepared as a concise working annex of Deliverable D2 and integrated into the draft methodology; it is not a separate contractual deliverable.

The review shall explicitly identify which parts of the international practice are suitable for direct use, which require adaptation, and which are not appropriate due to data limitations, scale, building typologies, institutional context or intended use of the interactive map.

    1. Data inventory and data architecture for hazard, exposure, vulnerability and ancillary data

The Consultant shall define the complete data architecture required for the Interactive Seismic Risk Map. This shall include, at minimum, hazard data, exposure data, vulnerability data and ancillary data such as administrative boundaries, building typologies, population/use information, critical facilities, infrastructure layers, basemaps and other contextual datasets relevant for interpretation.

Building typologies shall be defined as in the Rapid Visual Screening methodology under GD 334/2025 and the RVS data model developed under Activity 1b, which constitute the controlled national typology vocabulary; the mapping of this vocabulary to international schemes (EMS-98 vulnerability classes, GEM building taxonomy) shall be documented so that international fragility evidence can be applied consistently.

Hazard input shall be consumed at the finest administrative-unit level for which the Activity 1a outputs are produced — the first-tier administrative units (commune/town/municipality) — so that risk results are directly comparable across all administrative units of the country; the underlying hazard grid may be used for verification.

For each risk component, the Consultant shall define the minimum required datasets, spatial unit, scale/resolution, mandatory fields, data type, units, source/owner, update frequency, access conditions, quality level, limitations and relation to the calculation model. The methodology shall clearly distinguish between mandatory data for calculation, optional data for improved interpretation, and data that can be added in future updates.

The Consultant shall define explicitly how gaps in building data are identified and filled, including: a documented hierarchy of sources (RVS screening data as they become available > cadastral and administrative records > statistical/census data > documented inference/proxy rules based on typology, construction period and settlement pattern); the inference rules themselves, with their limitations; a data quality/confidence flag attached to every exposure record or aggregate; and a phased data-improvement path linked to the RVS roll-out. The methodology shall state transparently that complete national building-level exposure will exist only as the RVS screening under Activity 1b progresses, and shall therefore be fully operational with aggregated and proxy exposure data in the interim.

The Consultant shall prepare a Data Inventory and Data Architecture Report. The report shall include a data catalogue, entity-relationship or equivalent data structure diagrams, attribute templates, coding rules, unique identifiers, links between hazard, exposure and vulnerability tables/layers, and rules for handling missing, uncertain or incomplete data.

The Consultant shall ensure that the data architecture is compatible with outputs from the seismic hazard methodology, RVS data collection, GIS processing and future interactive map use. The data architecture shall comply with the Common Data Standard of Subcomponent 3.1 (Section 3.12) — coordinate reference system, CUATM-based unique identifiers, RVS typology vocabulary, open file formats and metadata per ISO 19115 — and shall follow an open-data, open-format approach: reusable open formats and open-source-compatible structures shall be the default, and any proprietary software, platform or data structure proposed at any stage shall be technically justified and accompanied by an upfront assessment of licence and lifecycle costs for the Beneficiary. Particular attention shall be given to how building-level or locality-level RVS data can be aggregated, anonymized where needed, verified and connected to risk calculation and visualization workflows.

All datasets used or produced shall be recorded in a Data Register. The Data Register shall include at least: dataset name, source/owner, date of access, year/version, format, spatial coverage, temporal coverage where applicable, CRS/projection, key fields, processing steps, QC checks, limitations, license/access conditions, dataset version and location in the delivery package.

    1. Development of seismic risk calculation model and scenarios

The Consultant shall develop the methodological framework for calculating seismic risk for the purposes of the interactive map. The methodology shall explain the complete technical chain from input data to risk output: hazard input, exposed elements, fragility/vulnerability functions or vulnerability classes, scenario definition, calculation logic, uncertainty treatment, classification rules, aggregation and map presentation.

The Consultant shall define the mathematical formulation of the seismic risk model. As a minimum, the methodology shall explain how hazard, exposure and vulnerability are combined; what units and spatial levels are used; what assumptions are made; how results are aggregated; and what results can and cannot be interpreted from the model. The risk model shall be written in a way that allows independent technical review and reproduction.

The Consultant shall define the scenarios to be included in the methodology. These may include, depending on data availability and Client agreement, selected earthquake scenarios, return periods/probability levels, hazard intensity levels, building typology scenarios, occupancy or use scenarios, and alternative vulnerability assumptions. The methodology shall clearly indicate whether each scenario is intended for planning, prioritization, awareness, preliminary screening or detailed technical decision making.

Minimum mandatory risk output metrics. The methodology shall be capable of generating, and shall define the complete calculation procedure for, the following minimum set of risk metrics, aligned with GEM and EU practice: (i) expected damage distributions by building class and administrative unit for at least the 475-year and 2,475-year return-period hazard levels (consistent with the Activity 1a outputs); (ii) population exposed by damage class (human exposure indicators); (iii) Average Annual Loss (AAL), economic and human; and (iv) loss exceedance curves. Metrics (i)–(ii) shall be produced in the pilot and shall be producible nationally with the interim exposure data under Section 3.3. Metrics (iii)–(iv) shall be fully defined, implemented in the calculation procedure and demonstrated in the pilot at aggregated level using documented proxy replacement-cost and occupancy values; their national production at building-class resolution is data-dependent and shall be explicitly linked, in the update mechanism, to the availability of RVS exposure data (Activity 1b) and of validated national cost data.

The Consultant shall document all formulas, algorithms, calculation steps, input parameters, units and processing logic. The methodology shall include at least one complete worked example, showing how input data for a representative territorial unit, building class or pilot area is transformed into risk indicators and map outputs.

The Consultant shall describe how uncertainty is treated, including uncertainty in hazard values, building exposure, vulnerability classification, missing data, aggregation rules and scenario assumptions. Where quantitative uncertainty treatment is not feasible due to data limitations, the Consultant shall provide a transparent qualitative or semi-quantitative uncertainty classification and explain its implications.

    1. Exposure and vulnerability modelling rules

The Consultant shall define exposure and vulnerability modelling rules suitable for the data conditions and building stock of the Republic of Moldova. The methodology shall specify how exposed elements are identified, classified and represented in the risk model, including buildings, public facilities and, as contextual layers only, critical infrastructureor other assets agreed with the Client.

The exposure model shall define minimum attributes required for calculation and visualization,as in the Rapid Visual Screening methodology and the RVS data model (Activity 1b), such as location, building or asset type, use/function, construction material or structural typology where available, number of storeys, approximate construction period, occupancy or importance category, administrative unit and data quality flag. The Consultant shall define how missing values are treated and how alternative data sources may be used to fill or validate exposure information, per the data-gap strategy in Section 3.3.

The fragility/vulnerability model shall define how buildings or asset classes are assigned to vulnerability categories, vulnerability functions or scoring classes. The methodology shall explain the relationship with RVS outputs and shall clarify how field data collected through RVS can be transformed into vulnerability inputs for risk calculation. The methodology shall use lognormal fragility functions as the default representation for building typologies. For each typology of the national RVS vocabulary, the Consultant shall propose or adapt typology-specific parameters, including median intensity and logarithmic standard deviation, based on regional evidence, Romanian/Ro-Risk experience where accessible, GEM fragility data and EMS-98-consistent studies. The sources, applicability, assumptions, limitations and need for future calibration with Moldovan RVS/damage data shall be documented. This produces comparable results across all administrative units and allows consistent aggregation of risk results at raion and national level. The typology-specific parameters shall be derived and justified from regional evidence relevant to Vrancea intermediate-depth seismicity (including the Romanian enforced fragility sets and Ro-Risk experience), the GEM fragility database and EMS-98-consistent studies, with sources, applicability, units and limitations documented for each typology.

In addition to physical vulnerability, the methodology shall define a social-vulnerability module as a derived indicator layer, using available census and statistical data of the National Bureau of Statistics at administrative-unit level (e.g. age structure of the population, household composition, dwelling occupancy) and, where available, indicators of access to emergency response. The module shall operate exclusively on aggregated, non-personal data in line with Law 133/2011, shall carry data quality/confidence flags, and shall be presented as a complementary prioritization perspective, not as a modifier of the physical risk calculation. Where income or tenure data are not available at usable resolution — which is currently the case in the Republic of Moldova — documented census proxies shall be used and the limitation stated.

The social-vulnerability module shall consider, subject to data availability, the specific needs of vulnerable population groups, including older persons, persons with disabilities, children and other groups that may face additional barriers during seismic emergencies. The methodology shall explain how these considerations can inform risk communication, emergency preparedness and prioritization of public buildings, while ensuring the use of aggregated, non-personal data and avoiding discriminatory classifications.

The Consultant shall define aggregation and generalization rules so that building-level information can be used at territorial levels appropriate for public map display, planning and prioritization. The methodology shall clearly distinguish between preliminary screening results and outputs that may require detailed engineering assessment before use in investment decisions.

    1. Definition of risk indicators, derived indicators and threshold intervals

The Consultant shall define the risk indicators to be presented in the methodology and, where applicable, in the interactive map. The indicators shall be technically meaningful, understandable for users and compatible with the available data and calculation model.

As a minimum, the Consultant shall propose a structured set of indicators covering hazard-related inputs, exposure indicators, fragility/vulnerability indicators and combined risk indicators. The methodology may also include derived indicators such as relative risk index, expected damage class, priority class, potential affected assets, criticality-adjusted risk, data quality/confidence class, and scenario comparison indicators, subject to Client agreement and data availability. The criticality-adjusted risk indicator (weighting/flagging of public and critical-use buildings) and the social-vulnerability indicator (Section 3.5) shall be part of the minimum indicator set, in support of public-asset prioritization.

For each indicator, the Consultant shall provide a definition, formula or calculation rule, input data required, unit of measurement, spatial aggregation level, classification method, interpretation, limitations and intended use. Indicators shall not be defined only as labels; their technical meaning and calculation logic shall be explicit.

The Consultant shall define threshold intervals or classification levels for risk communication and prioritization. Thresholds shall be justified technically, using available data, expert judgement, international practice and consultation feedback. The methodology shall explain how thresholds may be updated when more data become available or when the Beneficiary decides to recalibrate priorities.

The final methodology shall include an Indicator and Threshold Matrix. The matrix shall contain at least: indicator name, type of indicator, formula or derivation rule, required data fields, unit, classification intervals, color/legend recommendation for map use, interpretation, limitations and QA/QC checks.

    1. Functional specification for the Interactive Seismic Risk Map

The Consultant shall prepare the functional specification for the Interactive Seismic Risk Map. This specification shall translate the seismic risk methodology into clear requirements for a GIS/web-GIS map or equivalent interactive platform. It shall be suitable for use by the Beneficiary, GIS specialists, an IT provider or a technical implementation team.

The functional requirements shall include, at minimum: map layers, layer groups, symbology rules, legends, filters, search tools, selection tools, scenario selection, comparison of results and scenarios, display of risk indicators, data quality/confidence information, pop-up attributes, export/import tools, report generation, map printing and user guidance and additionally: (i) selectable seismic scenarios and return-period levels, with an architecture extensible to future multi-hazard layers without redesign; (ii) filtering and display down to the lowest administrative unit (commune/town/municipality); (iii) downloadable GIS outputs (GeoPackage/GeoJSON) and tabular exports (CSV/XLSX) for authorized tiers; (iv) building-level query capability for authorized institutional users, with the public tier limited to aggregated results in line with Law 133/2011; (v) public and restricted access tiers with role-based rights; (vi) a bilingual Romanian/English user interface; (vii) responsive display usable on mobile devices; and (viii) a defined data-update mechanism (who updates, how versions are published, how the methodology version is displayed).

The non-functional requirements shall include, at minimum: expected performance, scalability, user access modes, role-based access if needed, security considerations, audit trail, logging, versioning, data update process, backup and recovery considerations, compatibility with commonly used GIS formats, browser/device expectations and minimum documentation requirements.

The Consultant shall clearly distinguish between the methodological and GIS/data requirements that must be met before the map can be accepted, and optional future functionalities that may be implemented later. The specification shall avoid over-engineering; it shall prioritize functions required for understanding and verifying seismic risk results.

No Key Expert for software development is required under this assignment; however, the IT / Web-GIS Functional Specification and Demonstrator Specialist defined in Section 7.4 is a mandatory non-key position, required in the team composition and assessed on a responsive basis. The functional specification shall be prepared by the seismic risk, GIS/data and methodology experts together with this specialist, because the core task is to define what the map must show, how the data are structured and how the results are interpreted, not to develop a complex custom application.

If the required datasets for the proposed pilot area are not available in time, the Consultant shall use an alternative pilot sample or synthetic/proxy dataset agreed with the Client, clearly marked as a methodology demonstrator and not as an official populated risk map.

    1. Methodology piloting, validation and use-case testing

The Consultant shall pilot the methodology to the extent possible using available or sample datasets agreed with the Client. The pilot shall demonstrate whether the proposed data architecture, calculation logic, indicators, thresholds and map presentation rules are technically coherent and practically usable.

The proposed default pilot area is the municipality of Chiinu (in whole or as 2–3 representative sectors, depending on data availability), complemented by one rural raion sample for contrast between urban and rural building stock. The pilot shall use the exposure data actually available at the time (RVS sample data if any, cadastral/statistical data, documented proxies per Section 3.3) and the Activity 1a hazard outputs as available; it shall demonstrate the minimum mandatory risk metrics of Section 3.4, including AAL and loss exceedance at aggregated level with documented proxy values.

The pilot may be implemented as a GIS-based demonstrator, a limited web-GIS configuration, a set of static and interactive map outputs, or another practical format agreed with the Client. The purpose is to test the methodology and specification, not to replace a full-scale production IT system if such a system is procured separately.

The pilot shall include at least one representative use case showing how a user can move from data layers to risk indicators, interpret the results, compare scenarios or thresholds, and export or document findings. The Consultant shall record issues found during piloting and propose corrections to the methodology or functional specification. The pilot shall test at least one use case for each end-user category defined in Section 2.1 (central authority prioritization; municipal planning; emergency management scenario view; investment programming).

The Consultant shall prepare a Pilot and Validation Note documenting the pilot area or sample dataset, assumptions, data limitations, calculation steps, map outputs, user feedback, identified issues, corrections made and remaining limitations. The note shall include a clear statement of what can be generalized nationally and what remains dependent on future data collection, especially RVS data.

    1. Technical workshops, consultations and revision based on comments

Stakeholder workshops on indicators, thresholds and use cases shall be held only after the seismic risk calculation model and scenario framework (Deliverable D2) have been technically stabilized, so that consultation addresses a mature model rather than open technical assumptions; the final validation consultation shall follow the draft methodology (Deliverable D4). The deliverables schedule in Section 5 reflects this sequencing.

The Consultant shall work in close coor

Apply on the World Bank website

New UN jobs every morning on Telegram: @unjobshub

All open positions at World Bank