Procurement of It infrastructure for strengthening DHIS 2 Implementation and data ware house

World Bank · Eastern and Southern Africa · Deadline: 29 Dec 2026

Specific Procurement Notice – Request for Proposals without Prequalification

Request for Proposal

Information Systems

(Design, Supply and Installation)

(Without Prequalification)

Purchaser: Federal Ministry of Health

Project: AFE Health Emergency Preparedness, Response, And Resilience MPA Project

Contract title: Procurement of IT infrastructure for strengthening DHIS 2 Implementation and data warehouse

Country: Ethiopia

Loan No. /Credit No. / Grant No.: E229-ET

RFP No:ET-MOH-480615-GO-RFB

Issued on: November 16, 2026

The Federal Democratic Republic of Ethiopia has received financing from the World Bank toward the cost of the Ethiopia Health Emergency Preparedness, Response & resilience program MPA, and intends to apply part of the proceeds toward payments under the contract for Procurement of IT infrastructure for strengthening DHIS 2 Implementation g(Supply, installation, Testing, commissioning of information system, including technical support & Training service)

The Federal Ministry of Health, Ethiopia now invites sealed Proposals from eligible Proposers for the Procurement of ITS infrastructure for strengthening DHIS 2 Implementation and data warehouse.

S/N

Items (Category)

Description (measurable)

Unit

Quantity

Note / Remark (Acceptance criteria & measurables)

GENERAL REQUIREMENTS

1

General technical requirements

English UI/docs; UTF-8 support; operate on Ethiopian power (220–240V single / 380–415V three-phase, 50Hz); firmware/software latest stable at install

set

1

Acceptance: Verify UTF-8 display, sample English strings; power compatibility test; firmware/software version list; docs in English. Warranty: 3 yrs on-site. MAF if bidder ≠ OEM.

2

Environmental & Safety

Operate at 18–27°C, 40–60% RH non-condensing; ISO 14644-1 Class 8 air quality; noise ≤70 dBA aggregated

set

1

Acceptance: Environmental log (48-hr) within range; noise reading in aisle ≤70 dBA. EMC certificates (CE/FCC/EN) required.

STORAGE — SCALE-OUT / BACKUP

3

NVMe SAN (performance tier)

Usable NVMe SAN capacity150 TiB, SAN protocol, RDMA capable

TiB

150

Acceptance: Usable capacity verified; SAN connectivity test; RDMA handshake test; performance baseline (IOPS/latency) as vendor data.

4

Distributed NVMe NAS / Object / HDFS

Usable NVMe NAS/object capacity 400 TiB, support NFS/CIFS/HDFS/S3

TiB

400

Acceptance: Multi-protocol read/write tests; object multipart & versioning tests; throughput baseline.

5

HDD Tiering (capacity layer)

Usable HDD capacity 1.0 PiB, tiering with SSD cache

PiB

1

Acceptance: Tier migration test; capacity & performance after tiering; SSD cache hit ratio report.

6

Centralized backup ()

Physical capacity 200 TiB, active-active controllers, RAID-6 or equivalent

TiB

200

Acceptance: Backup speed ≥72 TB/hr system; restore ≤36 TB/hr; dedupe ratio evidence; RAID resilience test (tolerate 3 disk failure in RAID group where specified). Gartner leader vendor evidence required.

STORAGE NODE HARDWARE (minima)

7

All-flash NVMe SAN node (per node minima)

≥512 GB RAM; ≥96 CPU cores (48×2); 2×480 GB system disks; NVMe disks ~7.68 TB; 2×25GbE + 2×GE mgmt

node

as proposed

Acceptance: BOM check; boot & perf test; NIC throughput test.

8

All-flash NVMe NAS node (per node minima)

≥512 GB RAM; ≥96 cores; usable capacity guidance per vendor; 4×25GbE

node

as proposed

Acceptance: Multi-protocol access & concurrency tests.

9

HDD Tiering node (per node minima)

≥256 GB RAM (or spec), SSD cache 4×3.2 TB, ≥96 cores

node

as proposed

Acceptance: Cache eviction & rebuild tests.

COMPUTE / VIRTUALIZATION

10

Compute servers

Virtualization Computing Resource Pool: Rack servers: 2×x86 CPUs

CPU Cores

616

11

Compute servers

Virtualization Computing Resource Pool: Rack servers: 2×x86 CPUs

RAM

GB

5376

SDN / DATA-WAREHOUSE FABRIC

15

SDN Controller cluster

1-node cluster; manage ≥1.8K NVEs per 1-node cluster; OpenFlow/NETCONF southbound; REST northbound; intent orchestration, dry-run & rollback

unit

1

Acceptance: Controller cluster failover test; scale test report (1.8K NVEs); API call set; dry-run configuration and rollback validated. Third-party test reports required. MAF required.

POWER, COOLING & DISTRIBUTION

16

Aisle containment (cold containment)

Dual-row cold aisle module 7200×3600×2410 mm; double revolving doors; max IT load 235 kW

module

1

Acceptance: Physical dimensions check; containment pressure test; IT load capacity verification.

17

Server cabinets / racks

42U racks 600×1200×2000 mm; ≥75% perforation; rPDU mount; load ≥1500 kg/m²

unit

20

Acceptance: Rack assembly check; PDU mounting & earth continuity test.

18

In-row cooling units

Air in-row units, 46 kW each, horizontal flow, dual power

unit

4

Acceptance: Cooling capacity test at design load; redundancy & failover test; condensate & piping inspection. MAF required.

19

Power room AC

60 kW sensible cooling, downflow, RS485/Modbus/SNMP

unit

1

Acceptance: Power room temp/humidity control test; communications integration test. MAF required.

20

UPS systems

200 kVA (extendable to 300 kVA), 30-minute runtime at full load, hot-swappable bypass, SNMP/Modbus monitoring

unit

4

Acceptance: Runtime test at 100% load for 30 min; bypass maintenance test; battery health report. MAF required.

21

Main Distribution Board (MDB)

Prefab panel, 1000A busbars, digital metering, TCP/IP or RS485 comms

unit

2

Acceptance: Single-line drawings; functional metering test; protection/relays verification.

22

Power Distribution Frame (PDF) & PDB

PDF: 400A MCCB input, modular outputs; PDB wall-mounted 250A

PDF / PDB

PDF 2 / PDB 2

Acceptance: Overcurrent protection & SPD test; wiring inspection.

DCIM & OPERATIONS

23

DCIM system

Monitoring server (64GB RAM, SSDs), PoE switches, temp/humidity/smoke/water sensors, SMS alarm, 2×2 NOC displays, 8 workstations, browser/server software

set

1

Acceptance: Sensor calibration; SMS alarm test; PUE reporting capability; user role & report generation demo. MAF required.

PHYSICAL SECURITY

24

Dome cameras (analytics)

2MP, IP66, IR 30m, H.264/H.265, face/person detection

pcs

6

Acceptance: Video quality at 1080p; analytics accuracy sample; PoE power & DCIM integration test.

25

Bullet cameras

2MP, IP67, IR 50m, analytics

pcs

6

Acceptance: Night/IR test; analytics trigger tests.

26

NVR

64-ch 1080p, 6×8TB storage, 8GB RAM, integrate with DCIM

unit

1

Acceptance: Channel load test (320 Mbps), archival & search test, alarm integration.

27

Access control system

Central controller + readers (fingerprint+card+keypad), magnetic locks, emergency release; integrate with DCIM

doors

5

Acceptance: Access event logs; biometric enrollment & match rate; emergency release functional test; supply 25 IC cards.

FIRE SUPPRESSION & SAFETY

28

Fire suppression (FM200) & alarm

FM200 gas system for Main DC & Power room; conventional fire panel; detectors; gas discharge ≤10 sec

set

2

Acceptance: System commissioning test; EN54 compliance evidence; discharge timing test; manual abort & alarm tests. MAF required.

CIVIL & FIT-OUT

29

Raised floor (anti-static)

Anti-static tiles 600×600 mm, pedestal height 300–400 mm, load >400 kg/m²

m²

Main DC 25 + Power room 25

Acceptance: Floor flatness & load test; ESD resistance test.

30

Fire-rated walls & doors

Fire-rated cladding & doors; doors Type1 (1500×2400mm) & Type2 (900×2400mm) ≥1.5 hr rating

lot

as per design

Acceptance: Fire rating certificates; door operation & seals test.

31

Lighting & electrical fittings

LED 600×600 lamps, ≥500 lux with motion sensors, emergency LEDs 20-minute backup

set

as per rooms

Acceptance: Lux measurement; motion sensor response; emergency light test.

CABLES, ACCESSORIES & FURNITURE

32

Cabling & transceivers

Power & network cabling sized by bidder; FC & SFP modules; patch panels; accessories

lot

1

Acceptance: Cable test reports (OTDR/continuity); all transceivers present and tested.

33

Furniture (NOC/SOC)

NOC/SOC desks (metal + MDF), 24/7 high-back chairs, floor mats

set

Desks 8; Chairs 16

Acceptance: Ergonomics check; delivery & installation.

Cloud Planform requirement

34

Cloud Management

Cloud Management Platform to cover all the resources pools for computing, bare metal, storage and networks listed in platform sizing

set

1

License & SNS

35

Backup function

Inside Cloud Backup

set

1

License & SNS

36

Authentication

Cloud Security-Identity and Authentication

set

1

License & SNS

37

Security protection

Cloud Security-Security Group

set

1

License & SNS

38

Network ACL

Cloud Security-Network ACL

set

1

License & SNS

39

Security protection

Cloud Security-Virtualization isolation

set

1

License & SNS

40

Cloud Hardware Management

Cloud Hardware Management Platform to cover all the hardware for computing, bare metal, storage and networks listed in platform sizing

set

1

License & SNS

41

Cloud storage

cloud distributed storage software

set

1

License & SNS

42

Cloud Suite

cloud IaaS resource pool capabilities

set

Apply on the World Bank website

New UN jobs every morning on Telegram: @unjobshub

All open positions at World Bank